Ground Breaking on Overbridge 12 May 2016 |
The canalside road of Bagjola Canal crosses Biswa Bangla Sarani or Major Arterial Road close to Hidco Bhavan. A long-planned overbridge to reduce crossing at the high speed MAR was needed. But midway, the project was lying stalled due to technical reasons, one of them bneing the fact that the Airport-Garia Metro Line would pass over it. . After months of technical consultations, a revised design was finalised and yesterday work started. The time for conclusion would be 9 months. The flyover, when completed, would connect many village and per-urban zones just on the other side of Bagjola Canal (side opposite to New Town) and would reduce intersections.
* * *
Clippings:
Salt Lake Telegraph: 13 May 2016 |
No comments:
Post a Comment