I mentioned the following:
- that the structural portion would be handed over without last finishing and without lose furniture
- that operator would get real-time infoormation on the Convention Hall bookings whch are already pouring in
- that e-auction would be based on whoever gives the maximum revenue share over and above a fixed annual guarantee fee as specified in tender document
- that the most important aspect of the partnership would be to have a symbiotiic relatonship between Hidco (who would run the Convention Centre) and the operator (who would bring brannd recall).
There was a site visit after the meeting.
* * *
Clippng:
Khabar 365 dt 13 Nov 2016 |
No comments:
Post a Comment