Sunday, September 19, 2010

East West Metro Rail

Yesterday I went to Pouro Bhabhan, Salt Lake and had a meeting with KMRC, Chairperson Bidhannagar Municipality and our officers.
I am hopeful of a solution.
Here are two links to Anandabazar and Bartaman that reported on this:
http://www.bartamanpatrika.com/content/kolkata.htm
http://www.anandabazar.com/19cal5.htm
* * *
Yesterday I also spoke at a seminar on Urban Design at Town Hall, in the morning, before going to the Salt Lake meeting. I hope to uplink the transcript on the web and provide a link.*
***
Yesterday evening,I had a detailed discussion with the CEO Of Saffron Consulting Firm, Avik Chattpoadhaya, and had an engaging discussion on branding West Bengal
________________________________
* The link is:
.https://sites.google.com/site/nagarayan2010/home/urban-planning-for-west-bengal

1 comment:

  1. TOI: East-West Metro to get hi-tech touch
    http://timesofindia.indiatimes.com/city/kolkata-/East-West-Metro-to-get-hi-tech-touch/articleshow/11249524.cms

    "......
    Depending on the type of TBM, the muck will fall onto a conveyor belt system and will be carried out of the tunnel or be mixed with slur and pumped back into the tunnel entrance . In case of the East-West Metro corridor, the soil will initially be dumped at Howrah Maidan. Later, it will be transported to fill up the low-lying areas of Rajarhat Township.
    ......"

    ReplyDelete