Writing this from Delhi: before catching flight, I along with the whole engineering team of Hidco inspected a number of work sites. Yesterday, I'd done a similar inspection with NKDA engineering wing.
Today, we started a project for making box drain in Action Area 2A. It is close to the newly inaugurated Alia University. The box drain will be completed by 3 months, I was told. A photo:
|
Coconut breaking in Action Area 2A today: Box Drain for rain water |
* * *
Here are a few clippings:
|
Sanmarg dt 19 Nov 2014 |
Wi Fi Sanmarg
|
Ei Samay dt 20 Nov 2014 |
|
Labanhrad Sambad dt 19 Nov 2014 |
No comments:
Post a Comment