The New Town's water supply scheme will be launched on 28th January 2016. I went to the Water Treatment Plant yesterday to see how the trial run is proceeding. While calibrations are going on, I was interested to see how SCADA system (Supervisory Control and Data Acquisition) was enabling control of the whole plant. From one computer panel, I was shown how pumps can be switched on or off, what was the level of dozing chlorine etc. Here is a snapshot of the control panel:
No comments:
Post a Comment