I along with a host of Engineers visited the intake jetty and was pleased to find much progress in the massive intake jetty. A pic:
The only job required to be done is a 240 m underground tunneling which will now start - now that the railway permission has been obtained. A deep underground pit has been dug and the hydraulic jack system will start pushing from Monday to connect to the last bit. A pic:
I expect that the trial run where the first water will reach New Town water treatment plant at Action Area 1 before the Pujas.
* * *
Here are few clippings :
Ei Samay dt 4 Sep 2015 |
Congrats for the Railway Permission. It happened because you raised the right topic at the right place.